PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Constructing door frame at Stair -4 (800x600).jpg Tying the rebar mats at Elev. 7-Stair -4,5 Facing West (800x600).jpg Bolting steel frame at Derrick -1 Facing South (800x600).jpg Bolting the steel columns at Derrick -1 Facing South-West (800x600).jpg Building rebar mats for Elev. 7-Stair -4,5 Facing South East (800x600).jpg Derrcik -1 Facing North (800x600).jpg
Previous pageNext page Tying the rebar mats at Elev. 7-Stair -4,5 Facing West (800x600)
Tying the rebar mats at Elev. 7-Stair -4,5 Facing West (800x600)